nlbarber: (Default)
[personal profile] nlbarber
Work on uninstalling and re-installing the cabinets is proceeding. The granite countertop templating has been put off until tomorrow, which is a good thing because I called Betsy this morning to say "the island is looking better, but it's still only 30" wide after Jack built an extension on the 24" cabinet". It seems that he was tripped up by the same inaccurate drawings made by a cabinet supplier that (in small part) also led astray the incompetant installer. He has today to rebuild it to add the extra 6 inches, so I'll have a 6' x 3' island in the end.

Looks like they had to reposition the sink cabinet as well--the holes in the back have been re-cut about 6 inches to the left. Probably lots of other shifting went on that I just can't tell...

Just called Betsy to tell her that the high cabinet over the oven is supposed to have vertical dividers, not horizontal shelves. That means the cabinet was shipped wrong, so she'll either have to re-order or have Jack and crew re-tool what they did ship. I guess I'd better check the cabinet over the fridge location tonight as it was to have more shelves than the standard, for baking pan storage.

(no subject)

Date: 2006-06-14 04:37 pm (UTC)
From: [identity profile] hornedhopper.livejournal.com
It truly is one step forward and three back! Good thing you know *exactly* what you want.

Profile

nlbarber: (Default)
nlbarber

November 2016

S M T W T F S
  12345
67891011 12
13 14 15 16 17 18 19
20 212223242526
27282930   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags