Today was finishing on the framing, I think--at least there were some sounds of general nailing and sawing earlier in the morning. I left to run errands when the nail gun kicked in, nailing down the subfloor. I see a few patches have been added to the subfloor, like where the old utility room plumbing came out. The large pile of trash that had been taking over the driveway went away. Trash pile pic behind cut--but it got bigger than this before removal... )

The guy that was still here in the afternoon doing cleanup said the new door for the utility room-to-garage entrance won't be here until next Tuesday or Wednesday. I got him to help me put up some heavier plastic over the opening for the duration. Let's hope the temperature stays mild--I don't think the R value of that plastic sheet is very large.

Contractor called to say that the plumbing inspection would happen today (haven't checked the posted permit to see if it did), then electrical probably Monday and framing Monday or Tuesday. Sheetrock will start after the framing is signed off on. She also let me know about the subfloor nailing--it seems lots of the old nails had worked loose, and it all needed to be secured before the tile backer board goes down. This counts as an "unexpected condition" and costs extra: $75. All this inspection stuff will lead to paying off the subs for those pieces, so she also warned me that there will be another "draw" soon.

Profile

nlbarber: (Default)
nlbarber

November 2016

S M T W T F S
  12345
67891011 12
13 14 15 16 17 18 19
20 212223242526
27282930   

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags