nlbarber: (Default)
nlbarber ([personal profile] nlbarber) wrote2006-05-30 10:04 pm
Entry tags:

Tile is done!

The tile is done--all cut, laid, and grouted. I think it looks great, and will look even better once the haze left after grouting has been completely cleaned off. First finished surface!

I finally got the person at the plumbing house at 3 PM, after leaving 2 messages and calling many more times. Good thing I was prepared with my list of fixtures, complete with model numbers--she didn't have the "L" (for left-hand version) on the kitchen sink, and had a wrong, and much more expensive, instant hot-water heater, one that included a tap for filtered cold water in addition to the hot. My job is water use: I drink tap water. (And Atlanta water is not heavily mineralized.) Once that was straightened out, I gave her the credit card number and that's done.

I see that various types of molding have been delivered for the trim work around doors, and eventually the baseboard--I assume they'll trim tomorrow, and try to paint some either tomorrow or Friday around all the deliveries.

Post a comment in response:

This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting