nlbarber: (Default)
[personal profile] nlbarber
The tile is done--all cut, laid, and grouted. I think it looks great, and will look even better once the haze left after grouting has been completely cleaned off. First finished surface!

I finally got the person at the plumbing house at 3 PM, after leaving 2 messages and calling many more times. Good thing I was prepared with my list of fixtures, complete with model numbers--she didn't have the "L" (for left-hand version) on the kitchen sink, and had a wrong, and much more expensive, instant hot-water heater, one that included a tap for filtered cold water in addition to the hot. My job is water use: I drink tap water. (And Atlanta water is not heavily mineralized.) Once that was straightened out, I gave her the credit card number and that's done.

I see that various types of molding have been delivered for the trim work around doors, and eventually the baseboard--I assume they'll trim tomorrow, and try to paint some either tomorrow or Friday around all the deliveries.
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting

Profile

nlbarber: (Default)
nlbarber

November 2016

S M T W T F S
  12345
67891011 12
13 14 15 16 17 18 19
20 212223242526
27282930   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags